★ Must-know
📌 Corporate strategy sets the business’s north star, business strategy concerns specific markets, products, and value differentiation, and functional strategy covers supporting functions such as HR, finance, marketing, and operations.
Further detail
★ Must-know
Steve Sasson created the world’s first digital camera at Kodak headquarters in New York in 1975; it had 0.01 megapixels and was about the size of a toaster.
Kodak filed for bankruptcy in 2012.
Further detail
Kodak was founded in 1892 and introduced its first roll-based camera in 1888, selling a preloaded camera for $25 and processing the 100-exposure film for $10.
Kodak reached peak revenue of $16 billion in 1996 and peak profit of $2.5 billion in 1999.
Digital photography emerged at Kodak, but the company later filed for bankruptcy
★ Must-know
📌 Strategy, finance, and marketing decide what to offer, to whom, and at what price, whereas operations determines how the offer is delivered through work, people, steps, resources, and handoffs.
Further detail
📌 A question belongs to operations when answering it changes how a unit of customer value physically moves through the business.
Other functions decide the promise; operations makes it real
★ Must-know
A marketplace matches independent buyers and sellers it does not own; its operation centers on matching, trust, and dispute handling, while the platform rarely handles the goods.
A SaaS business sells ongoing access to software; its operation centers on uptime, onboarding, and support, and its marginal cost for one additional user is almost nothing.
A DTC business makes or sources physical products and sells directly to consumers, so its operation centers on supply, inventory, fulfilment, and returns.
📌 A marketplace meal business connects nearby cooks with hungry diners and must excel at local matching and trust, whereas a DTC meal business cooks and ships meals and must excel at kitchen capacity, cold-chain logistics, and inventory management.
📌 A company’s operational shape is determined by what it actually does: a business that buys inventory, warehouses it, and ships it to consumers operates as DTC even if it calls itself a platform.
Further detail
A physical service or retail business delivers services or sells goods through physical presence and staff, so its operation depends on capacity, location, staffing, and the in-person experience within space and opening-hour limits.
A meal venture built as DTC must manage kitchen capacity, cold-chain logistics, and inventory spoilage, whereas a marketplace connecting home cooks with nearby diners must build local matching and trust.
A marketplace matches cooks and diners; DTC cooks and ships the meals.
📐 Formula - A stock at the end of a period equals its previous level plus inflow minus outflow: .
A stock is measured at an instant; a flow is measured over time.
★ Must-know
📌 A balancing, or negative, feedback loop counteracts change and pushes a stock toward a target, whereas a reinforcing, or positive, loop amplifies change.
Further detail
📌 To prevent suboptimization, subordinate local metrics to a single global measure of system performance, even when some parts then appear inefficient.
Local optimization → slower system flow → missed customer promises.
🔄 To inspect an operation before changing it:
A meal-kit operation can be mapped with stocks of raw ingredients and finished boxes awaiting pickup, flows of box assembly and courier collections, and an outflow of shipped meal boxes.
★ Must-know
📌 Improving a non-constraint does not increase system throughput, whereas improving the constraint raises throughput one-for-one until another stage becomes limiting.
Further detail
When pressing capacity rises from 80 to 160 litres per hour, bottling at 130 litres per hour becomes the constraint in the juice line.
In a four-stage line with capacities of 50, 30, 45, and 60 files per day, stage 2 is the constraint, and adding 10 files per day there raises throughput from 30 to 40 files per day.
A faster non-constraint builds slack; a faster constraint raises system throughput.
★ Must-know
📌 Exploit and subordinate the constraint before elevating it, because these steps can recover wasted capacity without the expense of adding capacity.
Further detail
📌 Constraints may be physical, such as a single MRI scanner, policy-based, such as requiring manager approval before shipping, or organizational, such as sales and operations using different demand forecasts.
Identify, exploit, subordinate, elevate, then repeat when the constraint moves.
★ Must-know
📌 Variability in arrivals or service times creates queues, while utilization amplifies the resulting waiting; at low utilization idle gaps absorb arrival clumps, but at high utilization delays accumulate.
Further detail
📐 Formula - Utilization is calculated as .
📐 Formula - For one server in steady state, utilization is , where is the arrival rate and is the service rate.
📌 Utilization measures how busy a system is, but high utilization does not guarantee goal-directed throughput when the system produces the wrong items, builds unneeded inventory, or reworks defects.
Variability creates queues; high utilization amplifies their delays.
★ Must-know
📐 Formula - The average queue wait is proportional to the utilization delay factor: , where is average queue waiting time and not total time in the system.
The waiting factor is 1 at 50% utilization, 9 at 90%, and 49 at 98%.
The rule of thumb places the utilization curve’s knee near 85%: delay rises gently below it and grows catastrophically above it, but 85% is not a physical law.
Further detail
The waiting factor is 4.6 at 82% utilization and 11.5 at 92%, so increasing utilization by 10 percentage points more than doubles the factor.
With no variability, a perfectly regular system forms no queue even at 99% utilization.
For Team A at 70% utilization, the waiting factor is 0.70/0.30 = 2.33; for Team B at 95%, it is 0.95/0.05 = 19, about eight times as large.
When utilization falls from 96% to 80%, the waiting factor falls from 24 to 4, so an 8-minute average wait is estimated to fall to about 1.3 minutes.
Delay is convex in utilization, so the final increments of utilization impose disproportionately large waiting costs.
Picture the curve turning into a cliff near full utilization.
★ Must-know
📌 When work varies, fully utilized and responsive are mutually exclusive; cutting slack may save capacity costs but can cause large delays when demand spikes.
Further detail
Slack is a buffer for variability, not wasted capacity.
★ Must-know
Further detail
Examples of arrival variability include:
Examples of process variability include:
Ways to remove designed variability before it reaches the counter include:
In the Forno Aurora example, a desk serving 20 customers per hour has 75% utilization at 15 arrivals per hour and 90% utilization at 18 arrivals per hour.
In the Forno Aurora example, moving from 75% to 90% utilization triples the waiting factor from 3 to 9, giving an estimated wait of 18 minutes and a cycle time of 21 minutes instead of a 6-minute wait and 9-minute cycle time.
Adding a second 20-customer-per-hour desk at 18 arrivals per hour gives total capacity of 40 customers per hour and utilization of 45%.
In the Forno Aurora simulation, quiet rounds’ spare capacity cannot be recovered later to clear earlier arrival clumps.
Steady and bursty arrivals can share an average load but produce different queues.
Company shapes and operational focus
| Shape | Operational focus | Key constraint |
|---|---|---|
| Marketplace | Matching, trust, dispute handling | Enough buyers and sellers for timely matches |
| SaaS | Uptime, onboarding, support | Reliability and retention |
| DTC | Supply, inventory, fulfilment, returns | Physical logistics and product handling |
| Physical service or retail | Capacity, location, staffing, in-person experience | Space and opening hours |
Take a 11-question practice quiz on Capacity, Variability, and Waiting, with every answer explained.
1. Which description best captures strategy as a means of gaining competitive advantage?
2. A company is deciding its overall purpose, choosing the markets and products in which to compete, and assigning responsibilities to HR, finance, marketing, and operations. Which mapping correctly matches these decisions to strategy levels?
Memorize the key concepts of Capacity, Variability, and Waiting with 10 flashcards.
According to Hitt, Ireland, and Hoskisson (2013), what is strategy?
An integrated, coordinated set of commitments and actions that uses core competencies to gain competitive advantage.
How does strategy move a business toward a worthwhile destination?
Through competitive advantage, with the least difficulty and in the least time.
Who created the world’s first digital camera at Kodak in 1975?
Steve Sasson.
Upload your class notes and Revizly writes a study guide, a quiz and flashcards in about a minute.
Study guide maker