★ Must-know
Cost management aims to ensure sufficient project resources while controlling spending.
A cost management plan specifies:
Further detail
🔄 Project planning proceeds through these stages:
For an approved target cost of 10 with a ±15% tolerance, the accepted range is 8.5 to 11.5.
At an early project stage, an estimate of €4,000 ± 10% is more appropriate than reporting false precision when participant numbers are only approximate.
A catering estimate of €4,350 against a €4,000 budget is an 8.75% deviation, so it does not exceed a 10% corrective-action threshold.
Cost-estimate inputs include:
Plan costs → estimate costs → determine the budget → control costs
★ Must-know
Cost-estimation techniques include:
🔄 The final budget is formed by:
📌 The organization must approve the final budget before the project starts.
Further detail
Three-point estimating considers:
Using analogy, a prior marketing cost of €2,000 increased by 20% gives an estimate of €2,400 for a project that is 20% larger.
At €35 per participant, catering for 44 representatives is estimated at €1,540.
Estimated activity costs are quantitative estimates of the costs needed to complete project tasks, including resources, personnel, and risks.
The basis for estimates should be documented so calculations can be tracked, since costs may change after the estimate is made.
Picture task costs stacking into a project budget, with reserves added at defined points.
📌 Recurring costs repeat with the continuity of production at any frequency, whereas non-recurring costs result in a single expenditure.
Direct costs belong to one project; indirect costs are shared across projects.
★ Must-know
📐 Formula - The planned budget is the activity base cost plus contingency: .
Further detail
In the jewelry-store exercise, team labor (€300), equipment (€450), materials (€150), and other project costs (€100) total €1,000 in activity costs; adding €150 contingency gives a planned budget of €1,150.
For sending 1,000 letters, the listed costs produce an activity base cost of €3,449.40 and a planned budget of €3,499.40 after adding €50 contingency.
★ Must-know
Further detail
Follow the control loop: plan → measure → compare → analyze → correct.
★ Must-know
📐 Formula - Cost Variance is calculated as .
Further detail
📐 Formula - Cost Performance Index is calculated as .
📐 Formula - Schedule Variance is calculated as .
📐 Formula - Schedule Performance Index is calculated as .
📌 A negative CV indicates that actual cost exceeds the budgeted value of completed work, while a positive CV indicates that the work consumed less than expected.
📌 A negative SV indicates that less work has been completed than planned, and an SPI below 1 indicates progress below the planned level.
PV is planned work, EV is completed work valued at budgeted cost, and AC is money actually spent.
★ Must-know
📐 Formula - Estimate at Completion is calculated as and estimates the project's total cost.
📐 Formula - Estimate to Complete is calculated as and estimates the cost remaining to complete the project.
Further detail
📐 Formula - Variance at Completion is calculated as and estimates the difference between the budget and final cost.
★ Must-know
Internal financing sources include firm cash flow from operations and voluntary contributions from team members.
External financing sources include:
Further detail
Financial versus non-financial benefits, crossed with measurable versus non-measurable impacts.
| Cost type | Meaning | Example |
|---|---|---|
| Fixed | Independent of quantities produced | Event room rental |
| Variable | Changes proportionally with production | Bonuses or commissions |
| Direct | Attributable to one project | Exclusive project employee salary |
| Indirect | Shared across projects | Support-organization salaries |
| Recurring | Repeats with production continuity | Costs at any frequency |
| Non-recurring | Single expenditure | One-time cost |
| Source type | Examples |
|---|---|
| Internal | Firm operating cash flow; team contributions |
| External | State funding; grants; donations; sponsorship; crowdfunding; bank loans |
Take a 11-question practice quiz on Managing Project Costs and Budgets, with every answer explained.
1. What is the central aim of cost management on a project?
2. A project team is drafting its cost management plan. Which set of details should it specify to support consistent cost planning and control?
Memorize the key concepts of Managing Project Costs and Budgets with 10 flashcards.
What does cost management aim to ensure while controlling spending?
Sufficient project resources.
What estimation techniques are listed for project costs?
Expert judgment, analogy, parametric, bottom-up, three-point, reserves, and cost-of-quality analysis.
Which sequence does project planning follow from scope through control?
Scope, schedule, resources, costs, budget, and control.