What does cost management aim to ensure while controlling spending?
Sufficient project resources.
What estimation techniques are listed for project costs?
Expert judgment, analogy, parametric, bottom-up, three-point, reserves, and cost-of-quality analysis.
Which sequence does project planning follow from scope through control?
Scope, schedule, resources, costs, budget, and control.
How does bottom-up estimation calculate overall cost?
It sums costs for tasks listed at the smallest level of detail.
How do fixed costs relate to quantities produced?
They are independent of production quantity.
How do variable costs change with production level?
They change proportionally with production level.
How is the planned budget calculated from base cost and contingency?
Planned budget = base cost + contingency.
What are the stages of the cost control cycle?
Planning, measuring, comparing, analyzing, and correcting.
What does effective cost control consider and check?
Scope, schedule, resources, performance, value, and whether spending follows the plan.
In the jewelry-store exercise, what planned budget results after adding €150 contingency?
€1,150.
Answer 11 questions on Managing Project Costs and Budgets.
1. What is the central aim of cost management on a project?
2. A project team is drafting its cost management plan. Which set of details should it specify to support consistent cost planning and control?
Go over the full study guide for Managing Project Costs and Budgets.
Read the study guide →Upload your class notes and Revizly writes your flashcards in about a minute.
Flashcard maker