Managing Project Costs and Budgets

From the study guide

Course Outline

  1. Cost Management Planning
  2. Cost Estimation and Budgeting
  3. Project Cost Categories
  4. Budget Calculation Exercises
  5. Cost Control Process
  6. Earned Value Measures and Variances
  7. Project Cost Forecasts
  8. Financing and Project Benefits

1. Cost Management Planning

★ Must-know

  • Cost management aims to ensure sufficient project resources while controlling spending.

  • A cost management plan specifies:

    • Units of measure
    • Precision levels
    • Control thresholds
    • Performance measurement rules
    • Report types and frequencies

Further detail

  • 🔄 Project planning proceeds through these stages:

    1. Scope
    2. Schedule
    3. Resources
    4. Costs
    5. Budget
    6. Control
  • For an approved target cost of 10 with a ±15% tolerance, the accepted range is 8.5 to 11.5.

  • At an early project stage, an estimate of €4,000 ± 10% is more appropriate than reporting false precision when participant numbers are only approximate.

  • A catering estimate of €4,350 against a €4,000 budget is an 8.75% deviation, so it does not exceed a 10% corrective-action threshold.

Read the full study guide →

Practice quiz preview

1. What is the central aim of cost management on a project?

2. A project team is drafting its cost management plan. Which set of details should it specify to support consistent cost planning and control?

3. A project estimator reviews a set of methods before choosing one that uses optimistic, most-likely, and pessimistic estimates. Which technique is being considered?

Take the quiz (11 questions) →

Flashcard preview

What does cost management aim to ensure while controlling spending?

Sufficient project resources.

What estimation techniques are listed for project costs?

Expert judgment, analogy, parametric, bottom-up, three-point, reserves, and cost-of-quality analysis.

Which sequence does project planning follow from scope through control?

Scope, schedule, resources, costs, budget, and control.

How does bottom-up estimation calculate overall cost?

It sums costs for tasks listed at the smallest level of detail.

How do fixed costs relate to quantities produced?

They are independent of production quantity.

How do variable costs change with production level?

They change proportionally with production level.

See all 10 flashcards →

Frequently asked questions

What does the Managing Project Costs and Budgets study guide cover?

It covers the core concepts of Managing Project Costs and Budgets, organized by topic with the key definitions, explanations and takeaways, so it's easier to learn and remember.

Read the full study guide →

How many questions are in the Managing Project Costs and Budgets quiz?

The practice quiz has 11 multiple-choice questions, each with an explanation. Use it to check what you know and find your gaps.

Take the quiz (11 questions) →

How do I study Managing Project Costs and Budgets with flashcards?

There are 10 flashcards on Managing Project Costs and Budgets, with a question on the front and the answer on the back. Try to recall each answer before you flip, and let spaced repetition bring back the ones you miss.

See all 10 flashcards →